Power Factor Correction Explained

See first hand the savings that power factor correction can bring to your business! View detailed case studies of power factor correction work performed by Power Factor Services Ltd.
George Brown College
Project Overview
The Facility: 3 sites, for a total of 892,217 square feet
The Services: Power Factor Correction
Project Results
The Savings:
- $13,000/year from lower max. distribution charge & increased electrical capacity
Monthly Average Demand Avoidance: 255 kVA
Project Payback: 2.46 years